I can't give a 100% answer as It's been 3 weeks since my last trip but, I give some advice to our visitors assuming the resurfacing work has now finished (anyone?)

The choice is to continue into Rouen (A28) ignoring

the signs and diversions and you will find the tunnel into the city will only

allow you to take the right hand tunnel exit.  Take this exit (N15) and you will

arrive at a roundabout. Take the first exit (turn right) and you will follow

this along the bank of the Seine, passed the first bridge you come to (it is one

way and you can use that one on the way back)  the next bridge you can

take, (Pont Boieldieu) left after the bridge to the Quai Jean Moulin and back on

the original route (D18E)  to the cow roundabout and it's facilities.

Link to comment
Share on other sites

We're due to return to the UK on the 27th, so with a bit of luck the bridge may be open but it seems we're likely to hit delays with the tunnel.

I guess we will need to decide whether we continue to take the diversion via Pont de l'Arche or hope to see signs confirming the other bridge is now open.