Jump to content

A 34


Recommended Posts

Going past the Newbury roadworks towards Portsmouth on the 23rd (sun) traffic had a queue of 2-3 miles heading back towards the M4 interchange. Felt sorry for them and realising I was coming back on the 27th (thurs)after the 2100 arrival in Portsmouth, I thought that traffic around the Interchange would have eased by 2200 hrs. No chance, apart from the 40mph and the cameras, the lane was resticted from 2 to 1 whilst the resurfacing was carried out. Took half an hour to get on the M4 but their organisation certainly leaves a lot to be desired. Going out again August so I hope its done by then!!
Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

×
×
  • Create New...