Jump to content

Plumber/tiler/builder required to lay water UFH insulation pipe and tile large barn conversion floor 87210


Topcat33
 Share

Recommended Posts

Think it’s about 80 sq m using latest insulation and pipe work which can be tiled straight onto without screed

pipework just to area of manifold no further pipe work needed

Full schematics will be available on site

near Le Dorat

Thanks

Edited by Topcat33
Link to comment
Share on other sites

  • 2 weeks later...
  • 3 months later...

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

×
×
  • Create New...