Gyn_Paul Posted September 27, 2011 Share Posted September 27, 2011 Is there anyone with a wood-fueled CH system using a storage vessel and a Laddomat? (this will, I suspect, only mean something to those who have one!) If so, for the lower temperature demanded of an underfloor system, is it really more efficient to have one Laddomat on the supply side and another on the delivery side, or is that going to conflict with the local mixing at the u/floor manifolds?p Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now