Plumber/tiler/builder required to lay water UFH insulation pipe and tile large barn conversion floor 87210 in House Renovations Posted September 28, 2022 On 07/06/2022 at 05:23, Topcat33 said: Think it’s about 80 sq m using latest insulation and pipe work which can be tiled straight onto without screed pipework just to area of manifold no further pipe work needed Full schematics will be available on site near Le Dorat wordle unlimited Thanks It all depends !
Plumber/tiler/builder required to lay water UFH insulation pipe and tile large barn conversion floor 87210
in House Renovations
Posted
It all depends !