Jump to content
Complete France Forum

Window to door


PaulT

Recommended Posts

At the very minimum, you need to complete a déclaration préalable, as you are changing the outside appearance of the building.

'les travaux sur construction existante qui en modifient l’aspect extérieur doivent être précédés d’une déclaration préalable.'

You can get the form from the mairie or from this page: http://www.urbanisme.equipement.gouv.fr/rubrique.php3?id_rubrique=299

If there are other aspects to the area (conservation area, near a church...), you may need other forms.

Link to comment
Share on other sites

Damn.   I have just checked the form and it seems that you have to wait a month befor the work can be done.

I was hoping to convert the existing back door into a window (bottom half blocked in) during my next 3 weeks leave. Do you think I will be likely to get "instant approval" from the Maire or is the month "cast in tablets of stone"

Link to comment
Share on other sites

The new rules are strict on the timeline for the official reply and if they do not contact you within a month for more info, you have a tacit agreement to go ahead.

Vous avez déposé une déclaration préalable à des travaux ou aménagements non soumis à permis. Le délai d’instruction de votre dossier est de UN MOIS et, si vous ne recevez pas de courrier de l’administration dans ce délai, vous bénéficierez d’une décision de non-opposition à ces travaux ou aménagements.

http://www.urbanisme.equipement.gouv.fr/IMG/pdf/1_Recepisse_de_depot_d_une_declaration_prealable_cle568fd4-1.pdf

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...